Barzan Onshore Project Package 2

The EPC Project included Design, Construction and completion of 25 buildings in Process & Non-Process zones over 3.2 km2. The design was governed by feed spec & drawings from RASGAS, developed to conceptual level by JGC with project wide standardization & further design implemented by ASMD. The building design is subcontracted to Design consultants QDC & DESCO and managed by ASMD design department.

Ras Laffan Olefin plant

The Ras Laffan Olefin plant is one of the largest ethylene crackers plant in the world with a capacity of 1.3 Million tons annually. Ras Laffan Olefin Contract (RLOC) was a joint venture between Chevron Philips Chemicals Company and Qatar Petroleum.

Shell Qatar Pearl GTL Plant

The Qatar Shell Gas to liquids (GTL) plant is the largest GTL plant in the world and has the capacity to produce 140,000 barrels per day of GTL products and 120,000 barrels per day of oil equipment.

ASMD was awarded the building and civil works on the liquid process unit C5.

North Field East Onshore Project EPC-1 Package

Description: Construction of a 1500 beds camp for the North Field East project. The camp includes a canteen, medical aid center mosque, recreation hall, gym, and other ancillary facilities.